

The appropriate plumbing and electrical fittings are released for each pod in its own dedicated trolley from the central stores area and are taken to a benched pre-kit area for initial assembly.
A similar action takes place with timber frames for bulkheads, bath panels and other assemblies.
The pre-kit workshops are designed to speed up the assembly line procedure by pre-assembling the main plumbing, joinery and electrical components ready for efficient installation on the assembly lines.