

All the wall panel sections except one are placed in position on the floor panel (where specified) and are clamped together prior to permanent screw fixing with self-tapping screws.
The assembled ceiling/roof panel is lifted on to the wall panels and carefully aligned for bolt fixings. The remaining wall panel is placed into position, and all wall panels are secured to the floor panels with bolt fixings.
The pod frame is now in a rigid state and is moved to the main assembly hall for fitting out.