Manchester is RB Farquhar's first Park Inn contract for Rezidor Group

Client: Rezidor Group
Main contractor: Bowmer and Kirkland
Architect: The Manser Practice
Details: 252 floored bathroom and shower-room pods for new Park Inn at Lord Street, Manchester
Value: £570K
Duration: September 2007 - ongoing

Park Inn, Manchester

This project is RB Farquhar’s first Park Inn contract for Rezidor, following two Radisson SAS hotel developments for the group in Cardiff and Bristol during 2007 and early 2008.

The contract was awarded in 2007 following a factory visit to RB Farquhar’s bathroom pod assembly plant in Chomutov, the Czech Republic, by the Rezidor Group design team. 

The pods for the Manchester Park Inn are installed into a Bell and Webster precast concrete building structure, and comprise a mix of shower-rooms and bathrooms with over-bath showers.